{"type": "object", "properties": {"NOTICEID": {"type": "integer", "examples": ["117253", "117516"], "maximum": 9223372036854775807, "minimum": -9223372036854775808, "description": "Notice Identifier"}, "EFFECTIVEDATE": {"type": "string", "examples": ["2024/07/01 08:44:55"], "format": "date-time", "description": "Effective Date of Market notice\nWARNING: Despite what the name suggests, this is a datetime, not a date."}, "EXTERNALREFERENCE": {"type": "string", "examples": ["Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 03/07/2024", "Actual Lack Of Reserve Level 1 (LOR1) in the SA region - 30/07/2024", "CHG0090456 | Completed | Production | Renewal and update of AEMO's FBS_Prod_Hub.aemo.com.au server certificate", "CHG0090458 | Completed | Production | Planned Maintenance to Brisbane Internet firewall.", "CHG0090458 | Production | Planned Maintenance to Brisbane Internet firewall.", "CHG0090717 | Cancelled | Production | NSW Marketnet Router Replacement", "CHG0090717 | Production | NSW Marketnet Router Replacement", "CHG0090718 | Cancelled | Production | QLD Marketnet Router Replacement", "CHG0090718 | Production | QLD Marketnet Router Replacement", "CHG0090719 | Cancelled | Production | Change to MarketNet SSL VPN", "CHG0090719 | Production | Change to MarketNet SSL VPN", "CHG0090731 | Production | MSATS and eMDM July Maintenance Release", "CHG0090790 | Completed | Production | Maintenance activities to be performed on the  Gas Short Term Trading Market Systems Production.", "CHG0090827 | Completed | Production | Identity Service Config Update in Production.", "CHG0090827 | Production | Identity Service Config Update in Production.", "CHG0091021 | Completed | Pre-Production | Pre-Prod MSATS 53.1.1 Patch Maintenance Release", "CHG0091021 | Pre-Production | Pre-Prod MSATS 53.1.1 Patch Maintenance Release", "CHG0091273 | Completed | Pre-Production | Pre-Prod MASTS - eMDM  Maintenance AKS v1.28 upgrade", "CHG0091273 | Pre-Production | Pre-Prod MASTS - eMDM  Maintenance AKS v1.28 upgrade", "CHG0091275 | Completed | Production | MSATS - eMDM Maintenance AKS v1.28 upgrade", "CHG0091275 | Production | MSATS - eMDM Maintenance AKS v1.28 upgrade", "CHG0091507 | Production | As part of the Platform Services Patching Program, webMethods Inactive Production Application Servers in Brisbane will have critical s", "CHG0091533 | Completed | Production | Planned Outage for the Gas Short Term Trading Market Systems Production.", "CHG0091533 | Production | Planned Outage for the Gas Short Term Trading Market Systems Production.", "Cancellation - AEMO Intervention Event - SA region 05/07/2024", "Cancellation - AEMO Intervention Event - SA region 15/07/2024", "Cancellation - AEMO Intervention Event - SA region 18/07/2024", "Cancellation - AEMO Intervention Event - SA region 19/07/2024", "Cancellation - AEMO Intervention Event - SA region 20/07/2024", "Cancellation - AEMO Intervention Event - SA region 21/07/2024", "Cancellation - AEMO Intervention Event - SA region 22/07/2024", "Cancellation - AEMO Intervention Event - SA region 24/07/2024", "Cancellation - AEMO Intervention Event - SA region 25/07/2024", "Cancellation - AEMO Intervention Event - SA region 26/07/2024", "Cancellation - Load Restoration Direction in the NSW Region - 08/07/2024", "Cancellation - Possible intervention to manage power system security in SA region 05/07/2024", "Cancellation -Inter-regional transfer limit variation - constraint automation to manage Power System Security in NSW region - 08/07/2024", "Cancellation Inter-Regional Transfer limit variation - Directlink control unavailable (NSW Region).", "Cancellation Inter-Regional Transfer limit variation - Murraylink control unavailable (VIC Region)", "Cancellation of Actual (LOR1) condition in the NSW region - 03/07/2024", "Cancellation of Actual (LOR1) condition in the SA region - 30/07/2024", "Cancellation of Reclassification of a Non-Credible Contingency Event - SA region - 13/10/2023", "Cancellation of a Non-Credible Contingency Event: Armidale - Dumaresq 8C 330kV line and Armidale - Sapphire WF 8E 330kV line in NSW1 due to Lightning.", "Cancellation of a Non-Credible Contingency Event: Bannaby - Mt Piper 5A6 500kV line and Bannaby - Mt Piper 5A7 500kV line in NSW1 due to Lightning.", "Cancellation of a Non-Credible Contingency Event: Bayswater - Mt Piper No.5A3 500kV line and Wollar - Mt Piper No.5A5 500kV line in NSW1 due to Lightning.", "Cancellation of a Non-Credible Contingency Event: Eildon PS - Mt Beauty No.1 220 kV line and Eildon PS - Mt Beauty No.2 220 kV line in VIC1 due to Lightning.", "Cancellation of a Non-Credible Contingency Event: Farrell - Reece No.1 220 kV line and Farrell - Reece No.2 220 kV line in TAS1 due to Lightning.", "Cancellation of a Non-Credible Contingency Event: Farrell-John Butters line and Farrell-Rosebery-Newton-Queenstown line in TAS1 due to Lightning.", "Cancellation of the reclassification of a Non-Credible Contingency Event: Brinkworth-Davenport, Brinkworth-Templers West and Para-Templers West 275kV lines in SA due to severe weather warning .", "Cancellation of the reclassification of a Non-Credible Contingency Event: Para-Templers West and Magill-Torrens Island A 275kV lines in SA due to severe weather warning.", "Cancellation: Direction issued to:  AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN", "Cancellation: Direction issued to:  AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN", "Cancellation: Direction issued to:  AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN", "Cancellation: Reclassification of non-credible contingency event due to existence of widespread abnormal conditions - SA region.", "Cancellation: Reclassification of non-credible contingency event due to existence of widespread abnormal conditions - South Australia and Victoria regions.", "Correction - Non-credible contingency event - QLD region - 27/07/2024", "Direction - SA region 05/07/2024", "Direction - SA region 15/07/2024", "Direction - SA region 18/07/2024", "Direction - SA region 19/07/2024", "Direction - SA region 20/07/2024", "Direction - SA region 21/07/2024", "Direction - SA region 22/07/2024", "Direction - SA region 23/07/2024", "Direction - SA region 24/07/2024", "Direction - SA region 25/07/2024", "Direction - SA region 26/07/2024", "Direction - SA region 31/07/2024", "Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region", "Increase to QNI limit to next hold point of 1400 MW Qld to NSW", "Inter-Regional Transfer limit variation - Directlink - NSW Region", "Inter-Regional Transfer limit variation - Directlink control unavailable (NSW Region)", "Inter-Regional Transfer limit variation - Murraylink control unavailable (VIC Region)", "Inter-regional transfer limit variation - 89 Lismore - Coffs 330kV Line - NSW region - 08/07/2024", "Inter-regional transfer limit variation - Armidale Coffs Harbour 96C 132kV LINE - NSW region - 20/07/2024", "Inter-regional transfer limit variation - Coffs Harbour - Lismore (89) 330kV line - NSW region - 10/07/2024", "Inter-regional transfer limit variation - Crookwell- Gullen Range 3H and Bannaby - Crookwell 61 330 kV lines - NSW region - 04/07/2024", "Inter-regional transfer limit variation - Eraring - Newcastle 90 330kV Line - NSW region - 08/07/2024", "Inter-regional transfer limit variation - Heywood - South East 1 275 kV Line - SA region - 22/07/2024", "Inter-regional transfer limit variation - Heywood - South East No 2 275 kV Line  - SA region - 26/07/2024", "Inter-regional transfer limit variation - Heywood M1 Transformer - VIC region - 25/07/2024", "Inter-regional transfer limit variation - Heywood interconnector - SA and Vic regions - 19/07/2024", "Inter-regional transfer limit variation - Keilor - Sth Morang 500kV Line - VIC region - 25/07/2024", "Inter-regional transfer limit variation - Mitchell Singleton 95X 132kV LINE- NSW region - 20/07/2024", "Inter-regional transfer limit variation - Robertstown - Tungkillo No.1 275 kV line - SA region - 12/07/2024", "Inter-regional transfer limit variation - [outage element] - NSW region - 04/07/2024", "Inter-regional transfer limit variation - constraint automation to manage Power System Security in NSW region - 08/07/2024", "Inter-regional transfer limit variation -Murraylink - SA region - 06/07/2024", "Inter-regional transfer limit variation -Tungkillo-Tailem_Bnd 1 275kV LINE - SA region - 16/07/2024", "Load Restoration Direction in the NSW Region", "Load Shedding Direction in the NSW Region", "NON-CONFORMANCE Region NSW1 Monday, 1 July 2024", "NON-CONFORMANCE Region NSW1 Tuesday, 2 July 2024", "NON-CONFORMANCE Region NSW1 Tuesday, 23 July 2024", "NON-CONFORMANCE Region NSW1 Wednesday, 31 July 2024", "NON-CONFORMANCE Region QLD1 Friday, 12 July 2024", "NON-CONFORMANCE Region QLD1 Monday, 1 July 2024", "NON-CONFORMANCE Region QLD1 Saturday, 20 July 2024", "NON-CONFORMANCE Region QLD1 Saturday, 6 July 2024", "NON-CONFORMANCE Region QLD1 Sunday, 14 July 2024", "NON-CONFORMANCE Region QLD1 Sunday, 7 July 2024", "NON-CONFORMANCE Region QLD1 Wednesday, 24 July 2024", "NON-CONFORMANCE Region QLD1 Wednesday, 3 July 2024", "NON-CONFORMANCE Region SA1 Saturday, 6 July 2024", "NON-CONFORMANCE Region VIC1 Sunday, 14 July 2024", "Network Augmentation Commissioned - VIC Region - 18/07/2024", "Network Augmentation Commissioned - VIC Region - 30/07/2024", "Non-credible contingency event - QLD region - 27/07/2024", "Non-credible contingency event - QLD region - 30/07/2024", "PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the TAS Region [beginning] on 01/07/2024", "PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the TAS Region [beginning] on 29/07/2024", "PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the TAS Region on 02/07/2024", "PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the TAS Region on 03/07/2024", "PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 03/07/2024", "PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the TAS Region on 01/07/2024", "PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the TAS Region on 02/07/2024", "PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the TAS Region on 03/07/2024", "PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the TAS Region on 29/07/2024", "PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the TAS Region on 3/07/2024", "Possible intervention to manage power system security in SA Region", "RESERVE NOTICE MT PASA PUBLICATION 16 July 2024", "RESERVE NOTICE MT PASA PUBLICATION 2 July 2024", "RESERVE NOTICE MT PASA PUBLICATION 23 July 2024", "RESERVE NOTICE MT PASA PUBLICATION 30 July 2024", "RESERVE NOTICE MT PASA PUBLICATION 9 July 2024", "Reclassification of a Non-Credible Contingency Event: Armidale - Dumaresq 8C 330kV line and Armidale - Sapphire WF 8E 330kV line in NSW1 due to Lightning.", "Reclassification of a Non-Credible Contingency Event: Bannaby - Mt Piper 5A6 500kV line and Bannaby - Mt Piper 5A7 500kV line in NSW1 due to Lightning.", "Reclassification of a Non-Credible Contingency Event: Bayswater - Mt Piper No.5A3 500kV line and Wollar - Mt Piper No.5A5 500kV line in NSW1 due to Lightning.", "Reclassification of a Non-Credible Contingency Event: Brinkworth-Davenport, Brinkworth-Templers West and Para-Templers West 275kV lines in SA due to severe weather warning.", "Reclassification of a Non-Credible Contingency Event: Eildon PS - Mt Beauty No.1 220 kV line and Eildon PS - Mt Beauty No.2 220 kV line in VIC1 due to Lightning.", "Reclassification of a Non-Credible Contingency Event: Farrell - Reece No.1 220 kV line and Farrell - Reece No.2 220 kV line in TAS1 due to Lightning.", "Reclassification of a Non-Credible Contingency Event: Farrell-John Butters line and Farrell-Rosebery-Newton-Queenstown line in TAS1 due to Lightning.", "Reclassification of a Non-Credible Contingency Event: Para-Templers West and Magill-Torrens Island A 275kV lines in SA due to severe weather warning.", "Reclassification of non-credible contingency event due to existence of widespread abnormal conditions - SA region.", "Reclassification of non-credible contingency event due to existence of widespread abnormal conditions - South Australia and Victoria regions.", "STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the TAS Region on 30/07/2024", "STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the TAS Region on 31/07/2024", "STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the TAS Region on 03/07/2024", "STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the TAS Region on 29/07/2024", "STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the TAS Region on 30/07/2024", "STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the TAS Region on 31/07/2024", "STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the TAS Region on 29/07/2024", "STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the TAS Region on 30/07/2024", "STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the TAS Region on 31/07/2024", "Update - Direction - SA Region - 05/07/2024", "Update - Direction - SA region 05/07/2024", "Update - Foreseeable AEMO intervention in SA region", "Update - Non-credible contingency event - QLD region - 27/07/2024", "Update - Non-credible contingency event - QLD region - 30/07/2024", "Update - Possible intervention to manage power system security in SA region", "Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN", "Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN", "Update Direction - AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN", "Update Direction - SA region 21/07/2024", "Update Direction - SA region 25/07/2024", "[EventId:202407031730_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 03 July 2024 17:30", "[EventId:202407031755_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 03 July 2024 17:55", "[EventId:202407201330_NRM_VIC1_NSW1_started] NEGRES CONSTRAINT NRM_VIC1_NSW1 started operating from 20 July 2024 13:30", "[EventId:202407201430_NRM_VIC1_NSW1_stopped] NEGRES CONSTRAINT NRM_VIC1_NSW1 ceased operating from 20 July 2024 14:30", "[EventId:202407251000_NRM_VIC1_NSW1_started] NEGRES CONSTRAINT NRM_VIC1_NSW1 started operating from 25 July 2024 10:00", "[EventId:202407251115_NRM_VIC1_NSW1_stopped] NEGRES CONSTRAINT NRM_VIC1_NSW1 ceased operating from 25 July 2024 11:15", "[EventId:202407300730_NRM_VIC1_NSW1_started] NEGRES CONSTRAINT NRM_VIC1_NSW1 started operating from 30 July 2024 07:30", "[EventId:202407300755_NRM_VIC1_NSW1_stopped] NEGRES CONSTRAINT NRM_VIC1_NSW1 ceased operating from 30 July 2024 07:55"], "description": "External Reference for extra data pertaining to market notice"}, "LASTCHANGED": {"type": "string", "examples": ["2024/07/01 08:44:55"], "format": "date-time", "description": "Last date and time record changed"}, "NOTICETYPE": {"type": "string", "examples": ["MARKET"], "description": "Market Notice Type"}, "REASON": {"type": "string", "examples": ["QUVNTyBFTEVDVFJJQ0lUWSBNQVJLRVQgTk9USUNFDQoNClRoZSBGb3JlY2FzdCBMT1IxIGNvbmRpdGlvbiBpbiB0aGUgVEFTIHJlZ2lvbiBhZHZpc2VkIGluIEFFTU8gRWxlY3RyaWNpdHkgTWFya2V0IE5vdGljZSBOby4gMTE3MjU5IGlzIGNhbmNlbGxlZCBhdCAxNjQ1IGhycyAwMS8wNy8yMDI0DQogDQpNYW5hZ2VyIE5FTSBSZWFsIFRpbWUgT3BlcmF0aW9ucw==", "QUVNTyBFTEVDVFJJQ0lUWSBNQVJLRVQgTk9USUNFDQoNClRoZSBGb3JlY2FzdCBMT1IxIGNvbmRpdGlvbiBpbiB0aGUgVEFTIHJlZ2lvbiBhZHZpc2VkIGluIEFFTU8gRWxlY3RyaWNpdHkgTWFya2V0IE5vdGljZSBOby4gMTE3MjY5IGlzIGNhbmNlbGxlZCBhdCAwODIwIGhycyAwMi8wNy8yMDI0LiAgIA0KIA0KTWFuYWdlciBORU0gUmVhbCBUaW1lIE9wZXJhdGlvbnM="], "description": "Detail of market notices.\nWARNING: This column may be base64 encoded, because the raw values may contain newlines."}, "TYPEID": {"type": "string", "examples": ["GENERAL NOTICE", "INTER-REGIONAL TRANSFER", "LOAD RESTORE", "LOAD SHED", "MARKET INTERVENTION", "MARKET SYSTEMS", "NON-CONFORMANCE", "POWER SYSTEM EVENTS", "RECLASSIFY CONTINGENCY", "RESERVE NOTICE", "SETTLEMENTS RESIDUE"], "description": "Market Notice Type Identifier (Market - all participants. Participant - selected participants)"}}, "required": ["NOTICEID"], "description": "MARKETNOTICEDATA shows market notices data provided to all participants (market) and specific participants (participant).\nMARKETNOTICEDATA data is confidential to each participant, although some\nnotices are sent to all participants.\n\nSource\n\nMARKETNOTICEDATA updates immediately available.\nWarningLevel.WARNING: The `REASON` column may contain paragraphs of text with quoted newlines, so one CSV row may span multiple text lines. Be careful when reading the CSV. (Tell your library that `\"` is the quote character.) Recently, AEMO has started BASE64 encoding the column, which is great. However, the versions which are BASE64 encoded and the versions that are not are both marked as version 1 in the 4th metadata column. So depending on when and where you downloaded the file from, you may need to base64 decode, or maybe not. See more in [the guide](../../guide/preprocessing.md#special-characters).\n"}