{"package":"SETTLEMENT_DATA","pdr_config":{"mappings":[{"REPORT_NAME":"SETTLEMENTS","REPORT_SUB_TYPE":"ENERGY_GENSET_DETAIL","VERSION":1}],"transaction_type":"INSERT"},"documentation_urls":["https://nemweb.com.au/Reports/Current/MMSDataModelReport/Electricity/ElectricityDataModelReport_files/Elec56.htm#31"],"comment":"The Settlement Energy Genset report contains the Energy Transactions data for each generation meter point. This report is produced only for Settlement Date post the IESS rule effective date.","primary_keys":["DUID","GENSETID","PERIODID","SETTLEMENTDATE","STATIONID","VERSIONNO"],"columns":{"DUID":{"sql_type":"VARCHAR2(20)","pl_type":"pl.Categorical","mandatory":true,"comment":"The DUID for the meter associated with the GensetId","examples":["W/HOE#2"],"warnings":["This column may contain funny characters such as / (slash) or # (hash). This may break hive-style partitioning.\n"],"is_categorical":true},"GENSETID":{"sql_type":"VARCHAR2(20)","pl_type":"pl.Categorical","mandatory":true,"comment":"The GensetId for the Meter Id received","is_categorical":true},"PERIODID":{"sql_type":"NUMBER(3,0)","pl_type":"pl.Int16","mandatory":true,"comment":"The Period ID Identifier","is_integer":true,"num_int_bits":16},"SETTLEMENTDATE":{"sql_type":"DATE","pl_type":"pl.Datetime()","mandatory":true,"comment":"The Settlement Date of the Billing Week","examples":["2026/01/20 00:05:00"],"warnings":["Despite what the name suggests, this is a datetime, not a date."],"parse_csv_as_string":true,"is_s_datetime":true},"STATIONID":{"sql_type":"VARCHAR2(20)","pl_type":"pl.Categorical","mandatory":true,"comment":"The StationId identifier associated with the GensetId","is_categorical":true},"VERSIONNO":{"sql_type":"NUMBER(3,0)","pl_type":"pl.UInt16","mandatory":true,"comment":"The Settlement Run No","is_integer":true,"unsigned_int":true,"num_int_bits":16},"ACE_AMOUNT":{"sql_type":"NUMBER(18,8)","pl_type":"pl.Float64","mandatory":false,"comment":"The Adjusted Consumed Energy Dollar Amount","is_float":true},"ACE_MWH":{"sql_type":"NUMBER(18,8)","pl_type":"pl.Float64","mandatory":false,"comment":"The Adjusted Consumed Energy for the Meter Id (CE_MWh + UFEA)","is_float":true},"ASOE_AMOUNT":{"sql_type":"NUMBER(18,8)","pl_type":"pl.Float64","mandatory":false,"comment":"The Adjusted Sent Out Energy Dollar Amount","is_float":true},"ASOE_MWH":{"sql_type":"NUMBER(18,8)","pl_type":"pl.Float64","mandatory":false,"comment":"The Adjusted Sent Out Energy for the Meter Id.","is_float":true},"CE_MWH":{"sql_type":"NUMBER(18,8)","pl_type":"pl.Float64","mandatory":false,"comment":"The Consumed Energy for the Meter Id . Energy received in the meter reads (DLF Adjusted)","is_float":true},"CONNECTIONPOINTID":{"sql_type":"VARCHAR2(20)","pl_type":"pl.Categorical","mandatory":false,"comment":"The Connection Point associated with the DUID","is_categorical":true},"DME_MWH":{"sql_type":"NUMBER(18,8)","pl_type":"pl.Float64","mandatory":false,"comment":"The DME MWh value that is used to calculate the UFEA Allocation Amount","is_float":true},"LASTCHANGED":{"sql_type":"DATE","pl_type":"pl.Datetime()","mandatory":false,"comment":"The Last changed Date time of the record","examples":["2026/01/20 00:05:00"],"parse_csv_as_string":true,"is_s_datetime":true},"METERID":{"sql_type":"VARCHAR2(20)","pl_type":"pl.Categorical","mandatory":false,"comment":"The Meter ID Identifier (NMI)","is_categorical":true},"PARTICIPANTID":{"sql_type":"VARCHAR2(20)","pl_type":"pl.Categorical","mandatory":false,"comment":"The Participant Id Identifier","is_categorical":true},"REGIONID":{"sql_type":"VARCHAR2(20)","pl_type":"pl.Enum([\"QLD1\", \"VIC1\", \"TAS1\", \"NSW1\", \"SA1\", \"SNOWY1\"])","mandatory":false,"comment":"The Region Id for the Connection Point associated with the DUID","examples":null,"enums":["QLD1","VIC1","TAS1","NSW1","SA1","SNOWY1"]},"RRP":{"sql_type":"NUMBER(18,8)","pl_type":"pl.Float64","mandatory":false,"comment":"The Regional Reference Price for the Settlement Period","is_float":true},"TLF":{"sql_type":"NUMBER(18,8)","pl_type":"pl.Float64","mandatory":false,"comment":"The Transmission Loss Factor applied to the Connection Point Id. TLF is calculated based on the Net Flow at the TNI.","is_float":true},"TOTAL_AMOUNT":{"sql_type":"NUMBER(18,8)","pl_type":"pl.Float64","mandatory":false,"comment":"The Total Amount for the Meter Id (ACE_Amount + ASOE_Amount)","is_float":true},"TOTAL_MWH":{"sql_type":"NUMBER(18,8)","pl_type":"pl.Float64","mandatory":false,"comment":"The Total MWh for the Meter Id (ACE_MWh + ASOE_MWh)","is_float":true},"UFEA_MWH":{"sql_type":"NUMBER(18,8)","pl_type":"pl.Float64","mandatory":false,"comment":"The UFEA allocation amount applied to the Meter Data","is_float":true}},"visibility":"Private","trigger":"Daily Billing Run & Posting a PRELIM/FINAL and REVISE Billing Run"}