Skip to content

PDPASA

The PDPASA package provides a 30-minute solving process to the Market systemsThe current methodology for calculating reserves in the PreDispatch timeframe is determined in a post processing step using a heuristic calculation based the results and Interconnector limits from the PreDispatch run.The calculation is a reserve assessment based on the PASA solver similar to existing ST and MT PASA business processesThe process reflects all intra-regional and inter-regional network constraints as an input to the process

Tables

This package contains the following tables:

Name Description
PDPASA_CASESOLUTION The top-level table identifying a PDPASA case, reporting options applied in the case and summary results
PDPASA_CONSTRAINTSOLUTION PDPASA_CONSTRAINTSOLUTION shows binding and violated constraint results from the capacity evaluation, including the RHS value.
PDPASA_DUIDAVAILABILITY This report delivers available capacity, PASA availability and given recall period for all scheduled resources. Note that for an MNSP, DUID = LINKID in the MNSP_INTERCONNECTOR table.
PDPASA_FNM_CASESOLUTION PDPASA_FNM_CASESOLUTION shows the case run details, including the available run types, LOR and Deficit condition for each case.
PDPASA_FNM_CONSTRAINTSOLUTION PDPASA_FNM_CONSTRAINTSOLUTION shows manual or thermal constraint (created by PASA), including marginal value, violation degree, LHS and RHS.
PDPASA_FNM_DUIDAVAILABILITY PDPASA_FNM_DUIDAVAILABILITY shows Available Capacity, PASA Availability and Recall Period for all scheduled resources
PDPASA_FNM_INTERCONNECTORSOLN PDPASA_FNM_INTERCONNECTORSOLN shows cleared Interconnector flow for the interval.
PDPASA_FNM_INTERZONALSOLUTION PDPASA_FNM_INTERZONALSOLUTION shows cleared inter zonal flow for the interval and run type.
PDPASA_FNM_REGIONSOLUTION PDPASA_FNM_REGIONSOLUTION shows region demand, cleared values of resources, spare capacity, losses for each run type and intervals.
PDPASA_FNM_REGIONSUMMARY PDPASA_FNM_REGIONSUMMARY shows the summary of PDPASA outcome for each region.
PDPASA_FNM_ZONESOLUTION PDPASA_FNM_ZONESOLUTION shows zone demand, cleared values of resources, spare capacity, losses for each run type and intervals.
PDPASA_FNM_ZONESUMMARY PDPASA_FNM_ZONESUMMARY shows the summary of PDPASA outcome for each zone.
PDPASA_INTERCONNECTORSOLN PDPASA_INTERCONNECTORSOLN shows the results of the capacity evaluation for Interconnectors, including the calculated limits for the interval.
PDPASA_REGIONSOLUTION The PDPASA region solution data.Note that the OUTAGE_LRC Run Type is no longer reported from 31 July 2025.

Diagram

PDPASA

Package Documentation